lemon-mirror:
Home >> Mazda >> 1995 >> RX7 2RTR-1308cc 80 >> Repair and Diagnosis >> Starting and Charging >> Starting System >> Testing and Inspection >> System Testing >> Pull-Out Test

Pull-Out Test

1. Connect 12 volts to terminal S of starter solenoid and ground starter body, Fig. 20.

Fig. 20 Pull-out Test Connections:





2. Ensure pinion is pulled out.