lemon-mirror:
Home >> Freightliner >> 2004 >> Sprinter 2500 L5-2.7L DSL Turbo >> Repair and Diagnosis >> Starting and Charging >> Starting System >> Testing and Inspection >> Control Circuit Testing

Control Circuit Testing

The starter control circuit components should be tested in the order in which they are listed, as follows:
- Starter Relay - Refer to Starter Relay Diagnosis and Testing.
- Starter Solenoid - Refer to Starter Motor Diagnosis and Testing.
- Ignition Switch - Refer to Ignition Switch and Key Lock Cylinder
- Park/Neutral Position Switch - If equipped with automatic transmission.
- Wire harnesses and connections.